Coláiste Phádraig CBS, Lucan
Designed, fabricated and installed by our highly-experienced team, the 36 no. module building has added 1,350m2 of additional school accommodation, providing a bright and comfortable teaching environment.
The scope of works also included 500m of haul road; nearly a kilometre of Heras fencing; site set up; 80 no. foundations; watermain and public surface water diversion. The modules were fabricated over a four week period last year and installed in just 3 days, with no disruption to the school environment.
Tony Brady, Principal, Coláiste Phádraig commented “We were very impressed with the work carried out by Actavo Modular. All the preparatory work as well as the installation was done in a live school environment during the school term, with little or no disruption to school operations.”
Sincere thanks to Smith + Kennedy Architects and Donnachadh O'Brien & Associates for their work on this project.